MCS Certified NICEIC Approved OZEV Approved Queensferry, Deeside CH5 estimating@mara.uk.com
Skip to content
Home › Solar Panels › Saw Mill
Timber Processing · Grange · 2023

Saw Mill Solar PVTimber Processing

Rooftop solar PV at a working saw mill, delivered with Grange. Timber processing runs heavy machinery through the working day — generation and demand line up almost perfectly.

Solar PV installation at a saw mill by MARA Electrical with Grange — industrial solar installers North Wales
2023
Completed
Grange
Partner
Timber
Processing
MCS
Certified

Project summary

Rooftop solar PV at a working saw mill, delivered with Grange. Timber processing runs heavy machinery through the working day — generation and demand line up almost perfectly.

  • Client Grange
  • Scale Rooftop array
  • Completed 2023
  • Location Saw mill, UK
  • Service Timber processing solar
  • Installer MARA Electrical — NICEIC approved, MCS certified, based in Queensferry, Deeside

Heavy Machinery, Daylight Hours

Saw mills run hard from morning to evening. So do photovoltaic arrays.

Client / partner
Grange
Sector
Timber processing / saw mill
Completed
2023
Delivered by
MARA Electrical — MCS certified, NICEIC approved

Sawing Timber Takes Serious Power

A saw mill runs bandsaws, edgers, conveyors, extraction and dust handling — heavy rotating plant that draws substantial current whenever the mill is running. Extraction in particular runs continuously for safety reasons whenever machinery is live.

Mills typically operate daylight-shaped hours, which means their consumption curve tracks the solar generation curve unusually closely. Very little is exported.

On a timber site, where you put the panels relative to the extraction discharge matters as much as which way they face.

Timber sites also bring a specific consideration: sawdust. Airborne dust affects panel soiling and needs factoring into array positioning relative to extraction outlets and prevailing wind.

Timber Site Installation

Rooftop photovoltaics on an operational saw mill.

Rooftop Array

Photovoltaics installed across the mill roof, positioned with dust and extraction discharge in mind.

Structural Assessment

Roof capacity assessed for a working industrial building with significant internal vibration.

Electrical Connection

Connection into the mill’s distribution with protection, isolation and DNO notification.

Operational Working

Installation sequenced around milling operations and timber movements.

The Saw Mill Installation

What the Mill Got

Generation Matched to Milling

Output tracking the mill’s own daylight-hours consumption curve closely.

Reduced Running Costs

Heavy machinery load partly offset by on-site generation every working day.

Greener Timber Processing

Lower grid consumption supporting environmental credentials in a sector that trades on sustainability.

Certified Installation

MCS certified and NICEIC approved with full documentation on handover.

Rural & Agricultural Industrial Solar

Saw mills, agricultural buildings, feed mills and rural industrial units are common across North Wales, Denbighshire, Powys and the Cheshire plain — and are frequently overlooked for solar despite excellent roof area.

Rural sites often have weaker grid connections, which makes self-consumption even more valuable: you use what you generate rather than trying to push it into a constrained network. From our Deeside base we cover Flintshire, Denbighshire, Wrexham and the wider North Wales countryside.

Whatever your building type, we survey it, design for it and certify it. Talk to us about commercial solar panel installation, or browse the full solar portfolio.

Other Solar Case Studies

Questions About This Project

Who carried out the Saw Mill Solar PV project?

MARA Electrical carried out the Saw Mill Solar PV project for Grange. MARA Electrical are NICEIC approved electrical contractors and MCS certified solar installers, based in Queensferry on Deeside, serving Chester, Flintshire, Wrexham and North Wales.

How large is the Saw Mill Solar PV installation?

The Saw Mill Solar PV installation is Rooftop array. It was completed in 2023 at Saw mill, UK.

When was the Saw Mill Solar PV project completed?

The Saw Mill Solar PV project was completed in 2023.

Does MARA Electrical work outside North Wales?

Yes. MARA Electrical are based in Queensferry, Deeside and serve Chester, Flintshire, Wrexham and North Wales as their core area, but commercial projects have been delivered across the UK including Manchester, Liverpool, Kettering, Southampton, Norfolk and Scotland.

Free Feasibility Survey

Rural & Agricultural Solar

Mills, farms and rural industrial buildings often have the best roof area and the weakest grid — the ideal case for self-consumption. Free feasibility survey across North Wales.

or email solar@mara.uk.com · see all solar projects