The complete electrical services package for LJMU's Nursing and Allied Health facilities at Tithebarn Street — part of a £21 million refurbishment and extension, plus the adjoining Avril Robarts Library. Delivered for Willmott Dixon and Kimpton, started in 2019 and carried through Covid-19 to completion.
MARA Electrical delivered a £3,000,000 electrical services package for Liverpool John Moores University at Tithebarn Street — part of a £21 million refurbishment and extension of the Nursing and Allied Health facilities, plus the adjoining Avril Robarts Library. Working for Willmott Dixon and Kimpton, the scope ran from main distribution and lighting through to fire alarm, structured cabling and full security systems. Started 2019, delivered through Covid-19, completed August 2021.
One of the largest electrical packages MARA has delivered — and a reminder that behind the solar and EV work sits a full commercial electrical contractor.
Liverpool John Moores University set out to refurbish and extend its Nursing and Allied Health care facilities at Tithebarn Street, in the heart of Liverpool's city-centre campus, alongside a refurbishment of the adjoining Avril Robarts Library. The combined programme was valued at £21 million.
Teaching facilities of this kind are electrically demanding. Clinical simulation suites, lecture theatres, IT-heavy learning spaces, libraries and student services all carry different lighting, power and data requirements — and all of them have to meet the life-safety standards expected of a public building occupied by thousands of students.
MARA Electrical were appointed by Willmott Dixon and Kimpton to deliver the entire electrical services package, valued at £3 million. It remains one of the largest single electrical contracts we have completed.
From the incoming distribution boards to the access control on the doors.
New main distribution throughout the building, forming the electrical backbone for every system that followed.
Complete lighting installation across teaching spaces, lecture theatres, library, circulation and student areas.
Addressable, networked emergency lighting with central monitoring — self-testing rather than manual inspection, as a building of this scale requires.
Small power throughout, designed around clinical simulation equipment, IT-dense study areas and flexible teaching layouts.
Full structured cabling infrastructure supporting campus IT, AV and networked building systems.
Fire alarm installation to suit a large, multi-occupancy public education building.
Power and control wiring to heating, ventilation and air conditioning plant, coordinated with the mechanical package.
Security systems including CCTV and access control across a campus building open to thousands of students.
Intruder alarm installation completing the security package and integrated with the wider building systems.
From the LV switchpanel and containment to the finished teaching and student spaces above it.









Nine electrical disciplines delivered by one contractor, coordinated under a single point of responsibility rather than split across specialists.
Fire alarm, networked emergency lighting and security systems to the standard a public education building occupied by thousands demands.
A programme begun in 2019 and completed in August 2021, maintained through the most disrupted period UK construction has faced.
Delivered to the programme, documentation and site standards expected by Willmott Dixon, one of the UK's largest main contractors.
Most people find MARA through solar panels or EV charging. This project is the foundation underneath both. Designing a 1MVA supply for a 60-bay EV hub, or the electrical infrastructure for a 2.2MWp solar array, draws on exactly the same discipline as a £3m university package: distribution design, life-safety systems, and delivering to a Tier 1 programme.
Liverpool is around 45 minutes from our base in Queensferry on Deeside, along the M53 and through the Wirral — one of our closest major markets, alongside Chester, Flintshire and Wrexham. We have delivered further projects on Merseyside at Central Docks and Phoenix Place.
If you need a commercial electrical contractor for a large refurbishment, fit-out or new build, talk to us about electrical services and maintenance.
MARA Electrical delivered the electrical services package for Liverpool John Moores University's Tithebarn Street development, working for main contractors Willmott Dixon and Kimpton. MARA Electrical are NICEIC approved electrical contractors based in Queensferry, Deeside, serving Chester, Flintshire, Wrexham, North Wales and the North West.
The electrical services package was valued at £3,000,000, forming part of a wider £21 million refurbishment and extension programme. It is one of the largest single electrical contracts MARA Electrical has delivered.
New electrical services included main distribution, lighting, networked emergency lighting, small power, structured cabling, fire alarm, HVAC wiring and security systems covering CCTV, access control and intruder alarm.
Works started in 2019, continued throughout the Covid-19 pandemic and completed in August 2021.
Yes. Alongside this £3m university package, MARA Electrical have delivered electrical and renewable projects for Sainsbury's, Tesco, Aldi, Primark, NEXT, DP World, Iceland Foods and the Ministry of Defence, from a Deeside base serving Chester, North Wales and the North West.
Main distribution, lighting, emergency lighting, small power, structured cabling, fire alarm, HVAC wiring and security — delivered as one package by NICEIC approved contractors serving Chester, Deeside, Wrexham, North Wales and the North West.
or email estimating@mara.uk.com · see our electrical services