MCS Certified NICEIC Approved OZEV Approved Queensferry, Deeside CH5 estimating@mara.uk.com
Skip to content
Home › Solar Panels › Glass Manufacturing, Scotland
Industrial · Scotland · 2023

Glass Manufacturing Solar PVScotland

Solar PV at a Scottish glass manufacturing plant, delivered with Grange — our second glass installation after the North Wales plant, and evidence that our commercial solar capability travels well beyond the Welsh border.

Solar PV installation at a Scottish glass manufacturing plant by MARA Electrical with Grange
2023
Completed
Scotland
Location
Grange
Partner
Glass
Manufacturing

Project summary

Solar PV at a Scottish glass manufacturing plant, delivered with Grange — our second glass installation after the North Wales plant, and evidence that our commercial solar capability travels well beyond the Welsh border.

  • Client Grange
  • Scale Rooftop array
  • Completed 2023
  • Location Scotland
  • Service Industrial manufacturing solar
  • Installer MARA Electrical — NICEIC approved, MCS certified, based in Queensferry, Deeside

Solar This Far North

Scotland receives less annual irradiance than southern England — and commercial solar still stacks up. Here is why.

Client / partner
Grange
Location
Scotland
Sector
Glass manufacturing
Completed
2023
Delivered by
MARA Electrical — MCS certified, NICEIC approved

Northern Latitude, Sound Economics

A common objection to solar in Scotland is daylight — or the perceived lack of it. The reality is more encouraging: photovoltaic panels generate from daylight rather than direct heat, and actually operate more efficiently at lower ambient temperatures.

Scotland does receive less annual irradiance than the south of England, so a given array produces somewhat less over a year. But the commercial case for a manufacturer rests on displaced cost, not on peak yield. If a plant consumes everything it generates at full commercial rate, the arithmetic works at Scottish latitudes just as it does at Welsh ones.

Panels generate from daylight, not heat — and they run more efficiently when it is cool. Scotland is a better solar location than most people assume.

Glass manufacturing is among the most electrically intensive processes there is, so self-consumption is effectively total. Working with Grange, we delivered this installation in 2023, a year after the North Wales glass plant.

Industrial Installation in Scotland

Rooftop photovoltaics on an energy-intensive manufacturing site.

Rooftop Array

Photovoltaics installed across the manufacturing roof, laid out around plant, extraction and roof lights.

Structural Assessment

Roof capacity assessed and mounting specified for northern wind and snow loading.

Electrical Integration

Connection into the plant’s distribution, prioritising self-consumption by process load.

Production Maintained

Delivered without interrupting a continuous manufacturing process.

The Scottish Installation

What the Manufacturer Got

Displaced Commercial Rates

Generation consumed by process load, replacing electricity bought at full commercial price.

Carbon Reduction

Reduced grid consumption supporting the plant’s environmental reporting.

Specialist Contractor, Long Distance

Industrial solar expertise delivered several hundred miles from our base.

Certified Installation

MCS certified and NICEIC approved with full documentation.

Solar Across the UK, From North Wales

Scotland is the northern limit of our commercial reach, as Southampton is the southern. Between them we have delivered solar in Kettering, Bristol, Pontefract, Manchester, Liverpool, Norfolk and across North Wales.

Two glass manufacturing installations in successive years — one in North Wales, one in Scotland — reflect a genuine specialism in energy-intensive industry, where the numbers are strongest and the operational constraints tightest.

Whatever your building type, we survey it, design for it and certify it. Talk to us about commercial solar panel installation, or browse the full solar portfolio.

Other Solar Case Studies

Questions About This Project

Who carried out the Glass Manufacturing Scotland Solar PV project?

MARA Electrical carried out the Glass Manufacturing Scotland Solar PV project for Grange. MARA Electrical are NICEIC approved electrical contractors and MCS certified solar installers, based in Queensferry on Deeside, serving Chester, Flintshire, Wrexham and North Wales.

How large is the Glass Manufacturing Scotland Solar PV installation?

The Glass Manufacturing Scotland Solar PV installation is Rooftop array. It was completed in 2023 at Scotland.

When was the Glass Manufacturing Scotland Solar PV project completed?

The Glass Manufacturing Scotland Solar PV project was completed in 2023.

Does MARA Electrical work outside North Wales?

Yes. MARA Electrical are based in Queensferry, Deeside and serve Chester, Flintshire, Wrexham and North Wales as their core area, but commercial projects have been delivered across the UK including Manchester, Liverpool, Kettering, Southampton, Norfolk and Scotland.

Free Feasibility Survey

Energy-Intensive Manufacturing?

Glass, ceramics, food processing, metals — if your process draws heavily through daylight hours, solar self-consumption pays back fastest. Free feasibility survey UK-wide.

or email solar@mara.uk.com · see all solar projects