Public Sector · Eryri · Completed 2021

Snowdonia National Park Authority HQSolar PV, Penrhyndeudraeth

Solar PV for the Snowdonia National Park Authority headquarters at Penrhyndeudraeth — a public-sector building inside Eryri itself. When the client's entire remit is protecting a landscape, the installation on their own roof has to be beyond reproach.

Solar PV installation at Snowdonia National Park Authority HQ, Penrhyndeudraeth by MARA Electrical — commercial solar installers North Wales
2021
Completed
Eryri
Inside the national park
Public
Sector client
MCS
Certified install

Project summary

Solar PV for the Snowdonia National Park Authority headquarters at Penrhyndeudraeth — a public-sector building inside Eryri itself. When the client's entire remit is protecting a landscape, the installation on their own roof has to be beyond reproach.

  • Client Snowdonia National Park Authority
  • Scale Rooftop array
  • Completed 2021
  • Location Penrhyndeudraeth, Gwynedd
  • Service Public sector solar
  • Installer MARA Electrical — NICEIC approved, MCS certified, based in Queensferry, Deeside

Solar Inside a National Park

Generating clean power at the headquarters of the body responsible for protecting one of Britain's most celebrated landscapes.

Client
Snowdonia National Park Authority
Location
Penrhyndeudraeth, Gwynedd, Eryri
Sector
Public sector / local authority
Completed
2021
Delivered by
MARA Electrical — MCS certified, NICEIC approved

Practising What the Authority Preaches

Snowdonia National Park Authority — Awdurdod Parc Cenedlaethol Eryri — administers 823 square miles of protected landscape from its headquarters in Penrhyndeudraeth, near Porthmadog in Gwynedd.

An organisation whose statutory purpose includes conserving natural beauty and promoting sustainable use of its area is under a particular kind of scrutiny when it installs anything on its own building. The array had to deliver genuine generation while being entirely appropriate to a public building inside the national park boundary.

A national park authority installing solar on its own headquarters is not a gesture. It is the organisation applying its own standards to itself, in public.

For us it was also a matter of local pride. Eryri is on our doorstep, and working on the Authority's own headquarters is the sort of project that stays with a team long after the scaffolding comes down.

Design, Installation & Commissioning

Public-sector delivery with the documentation, compliance and care that a protected setting demands.

Rooftop Solar PV

Design and installation of the photovoltaic array across the headquarters building, sized to the Authority's own consumption profile.

Sympathetic Design

Panel layout and inverter siting planned around the appearance of a public building inside a national park, not just around peak yield.

Electrical Connection

Full electrical connection, protection and DNO notification, certified to BS 7671 18th Edition.

MCS Certified Handover

Commissioning, certification and handover under MCS, with the documentation a public-sector client requires.

The Installation at Penrhyndeudraeth

What the Authority Got

On-Site Generation

Clean electricity generated at the headquarters building, cutting bought-in power and the cost that comes with it.

Credibility on Carbon

A national park authority generating renewable energy on its own estate — the strongest possible answer to anyone asking whether it practises what it promotes.

A Local Contractor

Delivered by a North Wales electrical contractor rather than a distant national installer, keeping the spend and the expertise in the region.

Public Sector Compliance

MCS certified, NICEIC approved, fully documented — the standard public-sector procurement expects.

Solar Across Eryri, Gwynedd & North Wales

Penrhyndeudraeth sits at the head of the Dwyryd estuary between Porthmadog and Maentwrog, close to Portmeirion and the Ffestiniog Railway. From our Queensferry base on Deeside it is a run west along the A55 and down through the Conwy valley — a couple of hours, and well within the area we serve.

We install commercial and domestic solar right across North Wales: Gwynedd, Conwy, Denbighshire, Flintshire and Wrexham, as well as Chester and Cheshire. Projects like this and the 250kWp in-roof array at Pentre Canol in Denbigh sit in the same portfolio as our multi-megawatt distribution centre work in England — the same team, the same accreditations, scaled to the building.

Whatever your building type, we survey it, design for it and certify it. Talk to us about commercial solar panel installation, or browse the full solar portfolio.

Other Solar Case Studies

Questions About This Project

Who carried out the Snowdonia National Park HQ Solar PV project?

MARA Electrical carried out the Snowdonia National Park HQ Solar PV project for Snowdonia National Park Authority. MARA Electrical are NICEIC approved electrical contractors and MCS certified solar installers, based in Queensferry on Deeside, serving Chester, Flintshire, Wrexham and North Wales.

How large is the Snowdonia National Park HQ Solar PV installation?

The Snowdonia National Park HQ Solar PV installation is Rooftop array. It was completed in 2021 at Penrhyndeudraeth, Gwynedd.

When was the Snowdonia National Park HQ Solar PV project completed?

The Snowdonia National Park HQ Solar PV project was completed in 2021.

Does MARA Electrical work outside North Wales?

Yes. MARA Electrical are based in Queensferry, Deeside and serve Chester, Flintshire, Wrexham and North Wales as their core area, but commercial projects have been delivered across the UK including Manchester, Liverpool, Kettering, Southampton, Norfolk and Scotland.

Free Feasibility Survey

Public Sector Solar PV

MCS certified and NICEIC approved solar for local authorities, schools and public buildings across North Wales, Chester and Cheshire. Free feasibility survey with a full financial projection.

or email solar@mara.uk.com · see all solar projects