Pirtex Fleet EV Charging Case Study, Deeside | MARA
HomeEV Charging › Pirtex Fleet Charging
£10,000 · Fleet Charging · Completed May 2024

Pirtex Fleet EV Charging Installation Sevadis MaxiCharger Pedestals

A fleet EV charging installation for Pirtex's new electric vehicle fleet, delivered through Mobilize Power Solutions — 4 × 7kW Sevadis MaxiCharger AC sockets on dual pedestals, with ducting run from the electrical switchroom to EV block bases so future expansion is straightforward.

Pirtex fleet EV charging distribution board installed by MARA Electrical — dedicated EV supply for 7kW Sevadis MaxiCharger sockets, fleet charging Deeside
4
7kW AC sockets
2
Dual pedestals
£10k
Project value
2024
Completed

Fleet Charging for a New Electric Van Fleet

A compact, well-engineered fleet EV charging installation delivered for Pirtex through Mobilize Power Solutions — built so the next phase is straightforward.

Client
Pirtex
Main contractor
Mobilize Power Solutions
Service
Fleet EV charging installation
Project value
£10,000
Completed
May 2024
Chargers
4 × 7kW Sevadis MaxiCharger AC sockets on dual pedestals
Infrastructure
Ducting from electrical switchroom to EV block bases
Delivered by
MARA Electrical — NICEIC approved, OZEV approved installer

A New Electric Fleet Needed Somewhere to Charge

Pirtex had committed to a new fleet of electric vehicles. What they didn't yet have was anywhere on site to charge them — and a fleet without depot charging is a fleet that spends its time queuing at public chargers instead of working.

Fleet charging is a different design problem to workplace charging. Staff cars arrive in the morning and sit all day, so capacity can be shared. Fleet vehicles return to base together and need to be ready together, which means every socket has to deliver its full output when it's called on.

The brief was modest in scale but clear in intent: charge the fleet reliably now, and make the next four sockets easy to add later.

Working through Mobilize Power Solutions, we designed and installed the charging infrastructure alongside the groundworks — with the future expansion built into the ducting rather than left as someone else's problem.

Design, Installation & Commissioning

Dual-pedestal fleet charging with the civils and containment done properly first time.

4 × 7kW Sevadis Sockets

Design, installation and commissioning of four 7kW Sevadis MaxiCharger AC sockets, mounted on dual pedestals to serve the electric van fleet.

Groundworks & Block Bases

Excavation and installation of EV block bases to carry the pedestals — a solid, permanent foundation rather than surface fixings.

Ducting From the Switchroom

Ducting run from the existing electrical switchroom out to the EV block bases, keeping cable routes protected and accessible.

Easy Future Expansion

Containment and capacity specified with growth in mind, so adding further fleet charging points doesn't mean digging the yard up again.

From Trench to Commissioned Pedestals

The full sequence — groundworks, ducting, distribution board and final pedestal installation.

What Pirtex Got

A working depot charging facility, and a straightforward path to doubling it.

Fleet Charges On Site

Four 7kW sockets across dual pedestals mean the electric van fleet charges at base overnight instead of relying on public infrastructure.

Built on Proper Foundations

EV block bases and buried ducting rather than surface-run cable — a permanent installation that stands up to a working yard.

Expansion Designed In

Ducting and containment sized ahead of demand, so the next pedestals connect into existing infrastructure.

Certified & Compliant

Installed and commissioned by NICEIC approved electricians to BS 7671, with full certification on handover.

Small Projects Deserve the Same Engineering

At £10,000 this was a fraction of the value of our 60-bay hub work — and it received exactly the same approach. The ducting was buried properly, the bases were formed to carry the pedestals permanently, and the distribution board was specified for more than the four sockets it currently feeds.

That matters because fleet electrification rarely stops at four vehicles. The businesses that get this right treat the first installation as phase one of a plan, not a one-off purchase. Getting the civils and containment right at the start is what makes phase two affordable.

From our Queensferry base on Deeside, we deliver fleet and commercial EV charging across Flintshire, Chester, Wrexham and the wider North Wales and Cheshire area — from four sockets in a depot yard to sixty in a purpose-built hub.

Other EV Charging Case Studies

Free Site Survey

Electrifying a Fleet? Start With the Infrastructure

We install depot and fleet EV charging across Deeside, Chester, Wrexham and North Wales — sized for the vehicles you run now and the ones you'll add next.

or email accounts@mara.uk.com · see all commercial EV charging