MCS certified commercial solar panel installers with 15+ years and 980+ projects delivered — from single retail units to multi-megawatt distribution centres. Trusted by Sainsbury's, Tesco, Aldi, Primark, NEXT, DP World and the Ministry of Defence.
Fifteen years of large-format commercial and industrial solar across the UK, engineered by NICEIC approved electricians and MCS certified installers.
As experienced commercial solar panel installers in Chester, Deeside, Wrexham and across North Wales, we design every commercial solar PV system around your energy use, your roof and your payback — not a one-size template.
From government estates to multi-megawatt distribution centres — a selection of commercial solar panel installations delivered by our Chester and North Wales team for some of the UK's biggest names, all completed to MCS standard.
2,200 kWp
2021
1,200 kWp
2015
650 kWp
2016
350 kWp
2015
300 kWp
2015
~200 kWp
2018–ongoing
~50 kWp ×40
2016–ongoing
250 kWp
2015
54 kWp
2019
~50 kWp
2016–2020
Liverpool
2018
Manchester
2019
North Wales
2022
Scotland
2023
Manufacturing
2023
Industrial
2023
Manchester
2022
Manchester
2023
A clear, managed process from first survey to grid connection — with your paperwork handled throughout.
Whatever your building type, we have installed commercial solar on one like it. From a single retail unit in Deeside or Wrexham to a national multi-site rollout, our engineering scales to fit — all backed by 15+ years as MCS certified commercial solar panel installers.
Commercial solar costs vary with roof size and output, but most systems work out between £600 and £900 per kWp installed, falling as scale increases. A 250kWp system typically returns its cost in 4 to 7 years through energy savings and Smart Export Guarantee payments, then generates free electricity for 20+ years. We provide a free commercial feasibility survey with a full financial projection.
Yes. Systems above 3.68kW per phase require a G99 application to your local Distribution Network Operator. MARA Electrical handle the full G99 process, including witness testing and Approval to Connect, as part of every commercial installation across Chester and North Wales.
Yes. We specialise in large-scale rooftop solar for warehouses, distribution centres, factories and retail units, and have delivered multi-megawatt systems for Sainsbury's, Tesco, Aldi, Primark, NEXT and DP World on both standing-seam and trapezoidal metal roofs, with structural surveys included.
Most commercial installations in North Wales and the North West pay back in 4 to 7 years — faster than domestic because businesses use more of their generation on-site during daylight. With 20-25 year panel warranties, that leaves well over a decade of free electricity and reduced carbon reporting.
Book a free, no-obligation feasibility survey and get a full financial projection for your roof. Commercial solar panel installers serving Chester, Deeside, Wrexham, Flintshire and North Wales — MCS certified, G99 managed, delivered by NICEIC electricians with 15+ years of commercial solar experience.
or email accounts@mara.uk.com for a commercial solar consultation
Every accreditation below is genuine, current and independently verified. Click any certificate to view the original document.